“Mercure Tbilisi Old Town” Hotel (Tbilisi)
- 2015
In May 2015 “Mercure Tbilisi Old Town” Hotel was done and Acoustic Group Engineers made acoustic and geometric measures of the building. In the result several problems were discovered and engineers gave some recommendations to improve acoustic characteristics of the building. After modification of the building, measures were done again and Hotel opened its doors for the tourists.
Hotel works since 2015.
Photos




















In May 2015 “Mercure Tbilisi Old Town” Hotel was done and Acoustic Group Engineers made acoustic and geometric measures of the building. In the result several problems were discovered and engineers gave some recommendations to improve acoustic characteristics of the building. After modification of the building, measures were done again and Hotel opened its doors for the tourists.
Hotel works since 2015.